Second power ship set to bolster energy grid before Christmas
The second power ship for the Demerara-Berbice Interconnected System (DBIS) is on track to add 75 megawatts to the national grid before Christmas. “There would be no blackout for Christmas or any low shedding. Any blackout we suffer might be a result of a vehicle damaging a power line or something of that nature,” Prime […]







